159 Frankton Road, Town Centre, Queenstown-Lakes, Otago. 9300, New Zealand
Consisting of 5 superbly appointed residences (one sold) Lakeside Villas bring together the best in contemporary architecture, the latest building systems and an unwavering attention to detail with all the elegance, style and grace you would expect from a luxury lifestyle investment.
Designed to deliver the ultimate home-away-from-home holiday experience for owners and guests alike, each Villa has been configured over 3 levels, with 4 bedrooms, 3.5 bathrooms and a seamless indoor-outdoor flow. Floor-to-ceiling glass, dramatic 2.7 metre ceilings and cleverly designed balconies deliver broad panoramic lake and mountain views. Stunning finishes including American Oak entrance, stairs and ceiling lining, cedar battening, stone benchtops and luxurious appointments with cedar weatherboard and schist feature wall completing a compelling design aesthetic.
Fully consented for 365 day Visitor Accommodation, Lakeside Villas not only mark a new era in lifestyle investment proposition, but also raise the bar for Queenstown’s 5-star accommodation offering.
Key Features include:
Boutique development consisting of just 5 Villas (two sold)
4 Bedrooms, 3.5 bathrooms, oversize single garage with internal access
239m2 total floor area (including single garage and balcony)
Oversize single garage (with owner’s storage) plus off-street parking
2.7m internal ceiling heights
American Oak entrance, stairs and ceilings
Luxurious tiles in living area and bathrooms
Stone Benchtops, wood-finished kitchen joinery, Miele appliances
Extensive heating package – gas fireplace, heat pumps to bedrooms, under-tile in bathrooms
Tiled balcony with schist feature wall and reticulated gas BBQ
Vertical Shiplap Cedar weatherboard exterior with plastered concrete on lower levels
Viking warm roof system
Security system and hardwired smoke alarms
Fully consented for 365 day Visitor Accommodation
10% deposit with balance on title
Freehold / Fee Simple Title
Construction well underway – completion no later than August 2020
Contact us now for or further information, income projections detailed plans and specification sheets.